Motorized Skylight Shade Installation Guide

ANJIAR INSTALLATION CENTER

How to Install Motorized Skylight Shades

A clear, safety-first guide for installing your custom motorized cellular skylight shade. Most installations take approximately 20–30 minutes after the mounting area is prepared.

Time: 20–30 minutes Recommended: 2 people for overhead or large shades
ANJIAR motorized cellular shade frame for vertical, sloped, and horizontal skylights
VIDEO INSTALLATION GUIDE

ANJIAR installation video

Our original product video will be added here. Until then, use the complete step-by-step guide below and the manual included with your shade.

Ask for installation help
01

Before you begin

Tools and safety

powerElectric drill
handymanScrewdriver
straightenTape measure
architecturePencil
horizontal_ruleLevel
stepStable ladder
Safety first: Use a stable ladder and a second person for overhead installation. Disconnect power before handling plug-in wiring. For high ceilings, difficult access, or permanent electrical work, use a qualified professional.
02

Package check

Confirm every component before drilling

  • Motorized shade and headrail assembly
  • Bottom aluminum frame
  • Left and right side tracks
  • Frame or mechanism cover
  • Mounting screws and hardware
  • Remote control
  • Selected power components
  • Product manual
03

Installation

Step-by-step assembly

  1. Dry-fit and confirm orientation

    Place the components inside the skylight recess without fastening. Confirm the opening direction, motor position, clearances, and that the ordered dimensions match the opening.

  2. Mark a square installation outline

    Use a level and pencil to mark the frame position. Keep the tracks parallel and allow clearance from handles, trim, and other obstructions.

  3. Secure the bottom frame

    Align the bottom aluminum frame with your marks, drill pilot holes where appropriate, and fasten it using suitable screws for the mounting surface.

  4. Insert and align the side tracks

    Seat both side tracks into the bottom frame. Check that they are straight, parallel, and square before tightening.

  5. Fasten the side tracks

    Fix both tracks securely. Recheck the opening width at the top and bottom so the shade can travel smoothly without binding.

  6. Seat the headrail assembly

    Insert the headrail ends into the side-track clips, move the assembly into its final position, and confirm that both sides are fully engaged.

  7. Connect the motor and selected power source

    Install the drive components supplied with your shade. Connect the plug-in, rechargeable battery, or solar components according to the included motor instructions.

  8. Install the cover and test operation

    Secure the protective cover, clear the travel path, then operate the shade through one complete open-and-close cycle. Stop immediately if the shade binds or the tracks move.

04

Final check

Before regular use

Frame

All corners are square and every fastener is secure.

Movement

The fabric travels smoothly and stays centered in the tracks.

Power

Cables and charging components are secure and clear of moving parts.

Controls

The remote and optional smart bridge operate the correct shade.

NEED HELP?

Send us your opening photos before drilling

For unusual skylights or unclear component placement, contact ANJIAR with your order number and photos of the opening.